What Your Bathroom Installation Includes
We remove the old bathroom, prepare the walls and floor, and fit the new suite and agreed finishes. We arrange the plumbing, electrical work and tiling together so you know who is doing each part of the job.
- Room measured at home
- Products and work listed in writing
- Fitting dates agreed
- Leaks, fittings and finish checked
Before the Old Bathroom Comes Out
At your home visit, we check the room size, pipework and electrical fittings. We discuss the bath or shower you want and the storage you need. You receive a layout and written quote before agreeing the products and fitting dates.
How Long Does Bathroom Fitting Take?
Many straightforward installations take around five to seven working days. Moving pipes, repairing floors or fitting detailed finishes can take longer. We explain the expected dates and when the toilet or shower will be unavailable before work starts.



